This checking fixture is for the structure around the glass to ensure the whole parts is good for the glass to mount. Most of our checking fixture is made by steel 45# or Aluminium6061#and Bakelitematerials 5166 and others.All the materials is fabricated byWatton(Songbai).The leadtime will be in 30 days according to the complicated ofthe configuration and the design /confirm/iation.It is used the wooden crate forthe checking fixture.could ship via DHL and other forwarder on the customerrequirement.
1.What about the working flow?
Received the purchasing order------Design------Confirming thedrawing/solutions------Prepare thematerials------CNC------CMM------assembling------CMM------Inspecting------(3rdparts inspections if need)------Package(with wooden)------delivery
2.What is the lead time for the product after confirm the drawing?
Normally,the leadtime is 15-25days,for specially complicate parts,thelead time will be 45days.
3.What kinds of software could support for design?
UG8.0,UG10.0,Catia V5,CAD 2007;
China checking fixture for the glass